The renovation will be carried out in two stages over a length of around 50 meters. First, the manhole covers and gullies will be replaced. The sewer will then be repaired underground by inserting a pipe liner. The work will cost around 60,000 euros.
There will be traffic disruptions during the construction work. A half-sided construction method without traffic lights is planned. Access for the fire department, emergency services and refuse collection will be possible during the entire construction period.